Fantastic turnout with our first KYMBA volunteer work day under our new city park management at Ben Hawes. Alex was able to get the two single track sections connected Thursday and Friday and then build out further Saturday with the help of 10 kymba volunteers. Lots of fun stuff in this section. Proof you can build a trail to spec and it still be a workout, be fun, and be fast! Several switchbacks and climbing turns, multiple berms and insloped turns, and lots of grade reversals to drain water. Over a mile of single track trail on the ground now that is all connected! its still hidden from general public as the ends are not opened to the double track yet until the section is "seasoned" a little.
Info here : http://www.kymba.org/forum/index.php?topic=236.0
Comments